Date uploaded: 2023-05-11 13:59:45

Last night we replaced a section of the old cast iron water main at the Hospital in Luverne MN. We changed 3-2” water service valves and added a 4” whole building water main valve. It took about 30 minutes to fully drain the 6” water main coming in to the mechanical room. Looks good!